extension crossing

Extension Crossing


Students traverse the first pedestrian bridge to be installed on campus in 15 years. The 141-foot-long, steel-framed expanse lies 19 feet above East Peltason Drive and connects the new, five-story Continuing Education facility (left) with the rest of the campus.